I've done a few engine and tranny rebuilds. After doing one removal and reinstall, the 2nd and further go significantly faster. On a previous car, the first removal took about 4 hours. After doing it once, I could get it off in a little over an hour, and back on in about 2. You've figured out the best way to access things, and don't waste time figuring out access, i.e. the top bell housing bolts on the kappa. You don't go back and forth between the car and your tool chest for different extensions and what not.
I'm sure the next time you dig in there it'll go much faster. Great job!