Physically, the compound project is finished. The motor starts and I'm glad no leaks internally or externally.
the car is at BTF's house way up in the hill of upstate NY, and he has a mile of driveway filled with snow. No truck dares to plow the snow since its a very steep uphill with tons of zig zags.
That's why he will have to wait until the snow melts before he can drive the car down for dyno tuning.
currently only thing to be worked on are:
- feed line and filter for the 2nd fuel rail (port injection)
- meth injection system install
- wiring the extra pressure sensors to the gauges
I already talked to Norm to create me a hardtop yesterday. He's finishing up with 40rty's unit, and he said about 2 more weeks, before he can start mine.
BTF, while waiting for the hardtop (ETA is 6 weeks from now)....will also start disassembling the interior.........and to fab a 10 point roll-cage.