since BTF finally wanted to finish this project.........he took two weeks off from his full time job.
here's what he accomplished in two weeks up to date:
Street/Dynotuning (estimated, about 2hrs so far)
Build double pass radiator and mounts
Fabricate intercooler piping/Vanjen refit
Construct 2nd fuel system, re-fab cell,
route hoses under vehicle, re-fab fuel rail for FPR mounting
Remove, prep, sand, powdercoat turbos, charge pipes
Tear down turbo kit, deliver to swaintech
Reinstall turbo kit
Solve lack of bracketry for fuel pressure accumulator
relocate power steering reservoir/fab all necessary brackets
Fabricate drain tube for low pressure turbo , .085 wall 6061
layout and plumb all oil feed and water cooling lines from engine to turbo
wrap, or fab heatshieliding for most hoses, harnesses
Fabricate exhaust from supplied components, hang on car
remove backbone plate, install harness and oil in transmission
Reinstall said plate, install the clutch line. “Bleed” clutch
Fabricate,clean,pressure test -an hoses. Lots of them lol!
Fabricate radiator shrouding, relocate PS cooler
Install hood,fenders,lip etc .
Weld up the holes in intake manifold, powdercoat
Install intake manifold on car, solve design flaws WRT fit
then here's the remaining stuff to do........then dyno tuning begins:
Remove Cryo2 system
Remove old boost controller
Install Eboost 2
Install Aeroforce gauges
Install aeroforce EGT add on kit w probes
Install pressure sensor kits for turbines
Remount water injection system to suit new build
Install secondary injector controller
Fabricate brackets on intercooler for Front bumper cover
Install engine harness , re route starter cables
remove ducts from bumper cover
rewire Killerglass LED's away from heat and for new location
Remount control box for LED's in panel
Remount AEM water/meth control box in panel
Fabricate panel box for electrical components
prep&powdercoat coil cover, power steering res brackets
layout and plumb all pneumatic wastegate lines
Weld boost braces to TB, machine steel peg for compressor side
Custom machine -10 AN tee to fit in OEM drain return
Trim, install turbine blankets
Rework AMP and trunk battery locations to fit Fuel cell (scary under that rug!)
R and I valve cover to allow top coolant fitting to screw in
Replace broken fender liner, conform with heat gun to turbo kit
Relocate fuse block and battery/cables for starter
Fabricate bolt on stand for Fuse block
Fabricate air cleaner/intake to low pressure turbo
Fix the firehazard 12v passthru to the engine bay
Dyno tuning…….and fix any bugs!!!